2U STORAGE ENCLOSUREQUICK INSTALL GUIDEFS4100, FS4500, SC4100, AND FC4100
9Connecting FC CablesThe FC4100 Storage Enclosure has removable Small Form-factor Pluggable (SFP) connectors that support copper or optical cables. En
10Connecting Ultra320 SCSI CablesSee the Adaptec 2U Storage Enclosure Installation and User’s Guide on the CD for supported cable lengths and addition
11Step 5: Connecting Power Cords to the APC Modules.Connect one of the supplied power cords to each of the APC modules and to a grounded power outlet.
RAdaptec, Inc.691 South Milpitas BoulevardMilpitas, CA 95035 USA©2004 Adaptec, Inc.All rights reserved. Adaptec and the Adaptec logo are trademarks of
1Kit Contents Adaptec Storage Enclosure (FS4100, FS4500, SC4100, or FC4100) CD, including software, drivers, and documentation Rail kit for rack in
2Safety TipsCaution: A fully loaded enclosure is heavy. Reduce the weight of the enclosure by removing the drive carriers before installing the enclos
3Installing into an Equipment RackBegin the installation by removing the components from the packaging and placing them on an antistatic surface until
43 Secure the rear rails you selected to the rear supports of the equipment rack, using the supplied screws, as shown in the Figure in Step 1 on page
57 Secure the front of the enclosure with one screw on each side, as shown in the next Figure.The equipment rack installation is complete. Continue wi
63 Remove the tower’s front bezel, as shown below, saving the screws for use in Step 5.4 Turn the enclosure 90° so that the right hand rack mount ear
72 With the cam lever of the drive slot fully open, slide the carrier into the slot until the lever starts to close.3 Push the cam lever until it enga
8Connecting SATA CablesThe FS4100 and FS4500 Storage Enclosures have removable Small Form-factor Pluggable (SFP) connectors that support copper or opt
Kommentare zu diesen Handbüchern